Transmission gully - tawa long drain
This Work involves:
This work involves in the X1 and X8 line : 1 headwall, 8 manholes and 244m of varied size concrete pipes.
In the X4 line : 10 manholes and 346m of varied size concrete pipes.
Project start: May/June 2017
Estimated completion: 2017/18
Last Updated: 5/12/2017